About ÇimTek
ÇimTek is both a manufacturer and an installer. Its fencing systems — panel fencing, grass fencing, PVC-coated and chain-link wire — are produced under TSE certification in its own 3,000 m² facility. In synthetic turf it is the main dealer of Nurteks, a leading manufacturer in the sector, with materials produced specifically for ÇimTek. Services cover four lines: synthetic turf, sports flooring, steel construction with fencing, and field equipment.
52
completed reference projects
120.427
m² of surface installed
22
provinces served

Emrah Yurtbaşı
After more than 25 years in the sector, including his tenure as Corporate Sales Director at Nurteks, he brought that field experience to ÇimTek, the company he founded on leaving that role.
Working to principles of quality and sustainability since its foundation, ÇimTek applies a separate engineering approach to each project according to site conditions, and serves amateur and professional clubs with systems built to FIFA standards.
Our own production
Panel fencing, grass fencing, PVC-coated wire and chain-link mesh are produced in our 3,000 m² facility equipped with new, modern machinery. Producing in-house allows project-specific dimensions, colours and wire thicknesses to be met, and shortens delivery times.
Standards and assurance
TSE
Certified fence production
FIFA Quality / Quality Pro
Football field systems
FIH
Field hockey standards
ITF
Tennis and padel court classification
Product and supply assurance
International material supply
In addition to its projects across Türkiye, ÇimTek supplies synthetic turf and sports flooring materials to the Balkans and the Middle East. Project-based quantities, shipping terms and technical support are shared on request.
Scope of service
The scope of service is not limited to material supply; field planning, substructure coordination, installation and technical consultancy are provided as a whole.
In addition to projects completed across Türkiye, materials are supplied to the Balkans and the Middle East.

Turnkey
The process runs in 5 stages